A ground-up residence in Brookline documented from site excavation and foundation construction through structural framing, enclosure, interior work, and final completion.

FRAMING COMPLETED · WINDOWS & SIDING NEXT

Exterior structural framing of the Beverly Road new home construction project in Brookline, MA

CURRENT PROGRESS · STRUCTURAL FRAMING

PROJECT TYPE

New Home Construction

LOCATION

Brookline, Massachusetts

PROJECT STAGE

Framing Completed

PROPERTY TYPE

Single-Family Home

CONSTRUCTION JOURNEY

Built in Chapters
Documented in Detail

Follow the Beverly Road home from site preparation and foundation work through framing, exterior enclosure, interior construction, and final completion. Each completed phase includes photographs, construction details, and project updates.

01

Pre-Demolition Asbestos Abatement

COMPLETED

02

Demolition, Excavation & Foundation

COMPLETED

03

Structural Framing

COMPLETED · LATEST UPDATE

04

Windows, Weatherproofing & Siding

NEXT PHASE

05

Mechanical Systems & Interior Construction

UPCOMING

06

Completed Home

UPCOMING

Interior structural framing and floor joists at the Beverly Road new home construction project in Brookline, MA

LATEST PROJECT UPDATE · PHASE 03

​The Home’s
Structure
Takes Shape

Structural framing is now complete, establishing the home’s floor systems, exterior walls, roof structure, sheathing, and primary window and door openings. The project is preparing for window installation, weather protection, and exterior siding.

PROJECT SCOPE

One Build.
A Complete Record.

This project record follows the Beverly Road home through the major stages of ground-up construction, showing how site work, structure, enclosure, building systems, and interior finishes come together over time.

02

Structural Framing

Floor systems, exterior walls, roof framing, structural sheathing, and window and door openings.

03

Building Envelope

Windows, exterior doors, weather protection, flashing, exterior trim, roofing, and siding.

04

Interior Completion

Mechanical systems, insulation, drywall, flooring, cabinetry, millwork, fixtures, and final finishes.

01

Site & Foundation

Site preparation, excavation, footings, concrete foundation walls, drainage, and backfill.

PROJECT FAQ

Beverly Road New Home Construction FAQs

What stage is the Beverly Road project currently in?

Structural framing is complete. The home’s floor systems, exterior walls, roof structure, sheathing, and primary openings are established. The project is now preparing for window installation, weather protection, and exterior siding.

​What work has been completed so far?

Completed work includes site preparation, excavation, concrete foundation construction, structural floor and wall framing, roof framing, exterior sheathing, and the formation of planned window and door openings.

What happens after structural framing?

The next phase will focus on window and exterior door installation, flashing, weather-resistant barriers, exterior trim, and siding. After the building envelope is secured, work can advance into mechanical rough-ins and interior construction.

Does WOW Construction build new homes in Greater Boston?

Yes. WOW Construction works with homeowners on new home construction, custom homes, additions, and major renovations throughout Greater Boston and nearby Massachusetts communities. Each project is planned around the property, design goals, construction requirements, and long-term use.

START A CONVERSATION

Planning a Custom Home in Greater Boston?

Tell us about your property, project goals, and the home you want to build. WOW Construction helps homeowners plan and construct custom homes throughout Greater Boston and nearby Massachusetts communities.

bottom of page