PROJECT BEVERLY / CONSTRUCTION JOURNAL / PHASE 02

DEMOLITION · EXCAVATION · FOUNDATION

Demolition,
Excavation &
Foundation

Following removal of the existing Beverly Road home, the site was excavated to establish the footprint of the new residence. Earthwork, soil removal, foundation layout, and concrete formwork created the structural base for the framing phase.

STATUS · COMPLETED

PHASE · 02 OF 06

NEXT · STRUCTURAL FRAMING

Aerial view of the new home foundation footprint at the Beverly Road construction project in Brookline

NEW FOUNDATION FOOTPRINT · AERIAL CONSTRUCTION VIEW

DEMOLITION

Removing the Existing
Beverly Road Home

With the pre-demolition preparation complete, the existing residence was taken down in stages. The demolition process opened the site for debris removal, excavation, and construction of the new home’s foundation.

Existing Beverly Road home in Brookline photographed before demolition for the new residence

01 · EXISTING HOME BEFORE DEMOLITION

Demolition crew removing the existing Beverly Road house before excavation for the new home in Brookline

02 · EXISTING STRUCTURE REMOVAL IN PROGRESS

The cleared site created the working area required for excavation and construction of the new foundation.

EXCAVATION & EARTHWORK

Opening the Site for
the New Foundation

After the existing structure was removed, excavation established the depth, footprint, and working area required for the new foundation. Excavated material was loaded and removed as the site was prepared for layout and concrete work.

Excavated foundation area for the Beverly Road new home construction project in Brookline

EXCAVATED BUILDING FOOTPRINT · FOUNDATION WORK AREA

01

Site Clearing

Remaining demolition material was cleared to create access and working space for excavation equipment.

02

Foundation Excavation

The new building footprint was excavated to establish the required foundation area and working depth.

03

Soil Removal

Excavated soil was loaded for removal while the site was shaped for the next foundation operations.

EARTHMOVING OPERATIONS

Excavating, Loading
and Clearing the Site

Excavation equipment reshaped the site while trucks supported the movement of soil and remaining material. Together, these operations created the open and defined work area needed for foundation construction.

Excavator moving soil during foundation excavation at the Beverly Road new home project in Brookline

01 · ACTIVE FOUNDATION EXCAVATION

Construction truck and excavator inside the protected Beverly Road work site in Brookline

02 · EQUIPMENT AND SITE ACCESS

Excavator loading soil into a truck during excavation of the Beverly Road new home site

03 · EXCAVATED SOIL LOADING

FOUNDATION LAYOUT

Defining the New
Home’s Structural Base

Once excavation was complete, the foundation layout established the exact footprint of the new residence. The aerial view documents the exterior shape, interior divisions, and coordinated service locations before the walls advanced.

Aerial view of the foundation layout for the Beverly Road new home construction project in Brookline

AERIAL FOUNDATION LAYOUT · NEW RESIDENCE FOOTPRINT

01

Defined Footprint

The foundation establishes the exterior shape and orientation of the new home within the property.

02

Interior Organization

The internal foundation lines begin organizing the structural zones that will support the building above.

03

Service Coordination

Planned service locations were coordinated with the foundation work before the next construction steps.

FOUNDATION WALL CONSTRUCTION

Forming the New
Foundation Walls

Panel forms translated the foundation layout into full-height wall shapes. The connected formwork defined the perimeter, interior divisions, openings, and changes in direction required by the new home’s footprint.

Foundation wall formwork defining the new Beverly Road home footprint in Brookline
Detailed view of braced foundation wall forms at the Beverly Road new home project in Brookline

01 · FOUNDATION WALL FORMWORK · OVERALL LAYOUT

02 · FORMWORK & BRACING DETAIL

The formed walls established the structural geometry needed before the project advanced into framing.

PHASE 02 · COMPLETED

A New Foundation
for the Beverly
Road Home

This phase transformed the property from an existing residence into the structural base of a new home. Demolition cleared the site, excavation established the building area, and the foundation work defined the footprint required for construction above.

Wide aerial view of foundation progress at the Beverly Road new home construction project in Brookline

FOUNDATION PROGRESS · AERIAL SITE CONTEXT

NEXT CONSTRUCTION PHASE · 03

DEMOLITION · EARTHWORK · FOUNDATION LAYOUT · WALL FORMWORK

With the foundation work complete, the project moved into construction of the home’s structural frame.

PREVIOUS PHASE · 01

PROJECT BEVERLY

NEXT PHASE · 03

PHASE 02 OF 06 · DEMOLITION, EXCAVATION & FOUNDATION