PROJECT BEVERLY / CONSTRUCTION JOURNAL / PHASE 01

PRE-DEMOLITION PREPARATION

Pre-Demolition
Asbestos Abatement

Before demolition began, asbestos abatement was completed by a specialty contractor to address identified materials in the existing house. Site protection, controlled removal, material handling, and disposal prepared the property for the demolition and new-construction phases that followed.

STATUS · COMPLETED

PHASE · 01 OF 06

NEXT · DEMOLITION, EXCAVATION & FOUNDATION

Front exterior of the existing Beverly Road home in Brookline before demolition and new construction

EXISTING HOME · BEFORE DEMOLITION · BROOKLINE, MASSACHUSETTS

PHASE OVERVIEW

Preparing the
Existing Home for
Safe Demolition

Before demolition could begin, identified asbestos-containing materials in the existing house needed to be addressed. A specialty abatement contractor established protected work areas, completed the controlled removal, and prepared the material for proper disposal.

Asbestos abatement was performed by a qualified specialty contractor before the general demolition phase.

Protected work area outside the Beverly Road home during pre-demolition asbestos abatement in Brookline

SITE PROTECTION · PRE-DEMOLITION ABATEMENT PREPARATION

ABATEMENT PROCESS

Controlled Removal and Material Handling

Protected work zones and controlled material handling helped isolate the abatement work from the surrounding property before demolition began.

Protected interior work area prepared for asbestos abatement at the Beverly Road home in Brookline
Specialty contractor performing controlled asbestos material removal before demolition at Beverly Road

01 · INTERIOR WORK-AREA PREPARATION

02 · CONTROLLED MATERIAL REMOVAL

Asbestos abatement materials being handled inside the existing Beverly Road home before demolition
Pre-demolition asbestos abatement work inside the Beverly Road property in Brookline Massachusetts

03 · CONTROLLED MATERIAL HANDLING

04 · PRE-DEMOLITION ABATEMENT WORK

Labeled asbestos material container used during pre-demolition abatement at the Beverly Road home in Brookline

LABELED MATERIAL HANDLING · PRE-DEMOLITION PHASE

KEY PROCESS DETAILS

Preparing the Property
for the Next Phase

01

Protected Work Areas

Work areas were isolated to help keep abatement activity separated from the surrounding property.

02

Controlled Removal

Identified materials were removed and contained by the specialty abatement contractor before demolition.

03

Labeled Material Handling

Removed material was sealed, labeled, and prepared for transfer through the abatement contractor’s disposal process.

PHASE 01 · COMPLETED

The Property Was
Prepared for
Demolition

After the specialty contractor completed the required asbestos abatement work and turned over the work areas, the project could move forward into general demolition. This preparation cleared the way for removal of the existing structure and the start of excavation for the new home.

SPECIALTY ABATEMENT CONTRACTOR · PRE-DEMOLITION WORK

Contained material being handled during pre-demolition asbestos abatement at the Beverly Road property

NEXT CONSTRUCTION PHASE

PREVIOUS PHASE

Project Introduction

PROJECT BEVERLY

NEXT PHASE · 02

PHASE 01 OF 06 · PRE-DEMOLITION ASBESTOS ABATEMENT